Home Index Site Map Up: Unknown Navigation
Up: Unknown
Baker Sidewalk Light Company - 1910 Sweet's Catalog, Page 633
Page 633
First: Baker Sidewalk Light Company - 1910 Sweet's Catalog, Page 632 Last: Baker Sidewalk Light Company - 1910 Sweet's Catalog, Page 633 Prev: Baker Sidewalk Light Company - 1910 Sweet's Catalog, Page 632 Next: Baker Sidewalk Light Company - 1910 Sweet's Catalog, Page 632 Navigation
1910 Sweet's
2 of 2

FACILITIES. We have the materials always on hand which can be assembled and set without delay. We do not have to wait to make patterns and castings. We can put down your sidewalks as soon as we receive the contract.
LAYING THE
WALK.
In laying our sidewalk a double steel wire mesh is used, composed of a double-wire mesh 316-inch steel crimped wire woven together for the purpose of reinforcement and for holding the glass in place. The mesh and glass are embedded in the concrete, filling the space between the glass, binding the mass and making a solid slab of great strength and permanent lasting qualities. The top surface is rubbed down smooth leaving a walk of good appearance and one that will weat perfectly smooth.
"BAKER" SIDEWALK LIGHTS UNDER CONSTRUCTION
BAKER SIDEWALK LIGHTS UNDER CONSTRUCTION
COST. Our walk costs no more at first than other makes and its wearing capacity makes it a profitable walk to lay. The expense of any work of this character is proportionate to its wearing qualities and on this basis our walk is cheap.