| FACILITIES. |
We have the materials always on hand which can be assembled and
set without delay. We do not have to wait to make patterns and
castings. We can put down your sidewalks as soon as we receive
the contract.
|
LAYING THE WALK. |
In laying our sidewalk a double steel wire mesh is used, composed
of a double-wire mesh 3⁄16-inch
steel crimped wire woven together for the purpose of reinforcement
and for holding the glass in place. The mesh and glass are
embedded in the concrete, filling the space between the glass,
binding the mass and making a solid slab of great strength and
permanent lasting qualities. The top surface is rubbed down smooth
leaving a walk of good appearance and one that will weat perfectly
smooth.
|

BAKER SIDEWALK LIGHTS UNDER CONSTRUCTION
| |
| COST. |
Our walk costs no more at first than other makes and its wearing
capacity makes it a profitable walk to lay. The expense of any
work of this character is proportionate to its wearing qualities
and on this basis our walk is cheap.
|